1. Derive the circuit model and physical design of the DC motor and generator: shunt, series and compound designs.
10 O*NET task matches
Batch:
Power Plant Operators4.7/5
45%ok
Control generator output to match the phase, frequency, or voltage of electricity supplied to panels.
Solar Photovoltaic Installers4.2/5
41%ok
Examine designs to determine current requirements for all parts of the photovoltaic (PV) system electrical circuit.
Fuel Cell Engineers3.4/5
41%ok
Design fuel cell systems, subsystems, stacks, assemblies, or components, such as electric traction motors or power electronics.
Hydroelectric Plant Technician4.4/5
39%ok
Start, adjust, or stop generating units, operating valves, gates, or auxiliary equipment in hydroelectric power generating plants.
Coil Winders, Tapers, and Fini4.6/5
39%ok
Operate or tend wire-coiling machines to wind wire coils used in electrical components such as resistors and transformers, and in electrical equipment and instruments such as bobbins and generators.
Electromechanical Equipment As4.0/5
39%ok
Read blueprints and specifications to determine component parts and assembly sequences of electromechanical units.
Power Plant Operators4.6/5
37%ok
Control power generating equipment, including boilers, turbines, generators, or reactors, using control boards or semi-automatic equipment.
Fuel Cell Engineers3.4/5
36%ok
Simulate or model fuel cell, motor, or other system information, using simulation software programs.
Parts Salespersons3.9/5
36%ok
Discuss use and features of various parts, based on knowledge of machines or equipment.
Electrical Engineers3.5/5
35%ok
Plan or implement research methodology or procedures to apply principles of electrical theory to engineering projects.
LO2CIM
2. Describe the fundamentals of 3-phase power theory: generation, Delta- and Y-configurations and 3-phase loads.
5 O*NET task matches
Batch:
Electrical Engineers3.5/5
42%ok
Plan or implement research methodology or procedures to apply principles of electrical theory to engineering projects.
Hydroelectric Plant Technician4.2/5
36%ok
Implement load or switching orders in hydroelectric plants, in accordance with specifications or instructions.
Computer Hardware Engineers3.3/5
35%ok
Specify power supply requirements and configuration, drawing on system performance expectations and design specifications.
Energy Engineers, Except Wind 3.8/5
31%ok
Review architectural, mechanical, or electrical plans or specifications to evaluate energy efficiency.
Power Plant Operators4.7/5
31%ok
Control generator output to match the phase, frequency, or voltage of electricity supplied to panels.
LO3CIM
3. Examine the transformer model and physical design of the Induction motor and generator, and their torque-speed parameters.
10 O*NET task matches
Batch:
Coil Winders, Tapers, and Fini4.6/5
39%ok
Operate or tend wire-coiling machines to wind wire coils used in electrical components such as resistors and transformers, and in electrical equipment and instruments such as bobbins and generators.
Electromechanical Equipment As4.0/5
38%ok
Read blueprints and specifications to determine component parts and assembly sequences of electromechanical units.
Coil Winders, Tapers, and Fini4.2/5
36%ok
Select and load materials such as workpieces, objects, and machine parts onto equipment used in coiling processes.
Power Plant Operators4.7/5
35%ok
Control generator output to match the phase, frequency, or voltage of electricity supplied to panels.
Rolling Machine Setters, Opera4.1/5
34%ok
Calculate draft space and roll speed for each mill stand to plan rolling sequences and specified dimensions and tempers.
Hydroelectric Plant Technician4.4/5
34%ok
Start, adjust, or stop generating units, operating valves, gates, or auxiliary equipment in hydroelectric power generating plants.
Wind Turbine Service Technicia4.5/5
34%ok
Start or restart wind turbine generator systems to ensure proper operations.
Extruding and Drawing Machine 4.3/5
33%ok
Determine setup procedures and select machine dies and parts, according to specifications.
Print Binding and Finishing Wo4.5/5
33%ok
Read work orders to determine instructions and specifications for machine set-up.
Paving, Surfacing, and Tamping4.2/5
33%ok
Start machine, engage clutch, and push and move levers to guide machine along forms or guidelines and to control the operation of machine attachments.
Source:
Course learning outcomes from
EWU's official Course Inventory Management (CIM) system.
O*NET task matches are computed by comparing each learning outcome
statement against every O*NET task statement using sentence-embedding
similarity; faculty review confirms which matches count as
preparation evidence.
Sign in to SIAM
GitHub is available now. More sign-in options are coming.